1. PROJECT: The Third Line of Uzbekistan-China Gas Pipeline Project
2. OWNER: Joint venture “ASIA TRANS GAS” pipeline limited liability company
3. EPC Contractor: China Petroleum Engineering & Construction Company (CPECC)
Completed:
The scope of work involves design, engineering procurement, manufacturing, assembly, fabrication, integration, configuration, inspection, testing, commissioning, and delivery of the following:
Technical Specifications:
Ø UCS1 compressor station and UCS3 compressor station,
Design pressure: 10 MPa; Flow:18000 Sm3/h; Main functions: filtering, metering, heating, pressure regulating.
Foot print:10m*2.4m*2.4m
Ø Ms Metering Station
Design pressure: 10 MPa; Flow:400 Sm3/h; Main functions: filtering, metering, heating, pressure regulating.
Foot print:9m*1.4m*2.4m
Ø Ms Metering Station(Station gas metering+ regulating)
Design pressure: 10 MPa; Flow:734000 Sm3/h/Single line, 7 lines in total;
Application:Trade measurement
Foot print of single line:24m*1m*1.4m